The installation process of shower room manufacturer is divided into the following ten steps:
Step 1: install the bottom basin of the shower room. The manufacturer of the shower room will first assemble the parts of the bottom basin, confirm the levelness of the bottom basin, and ensure that there is no water in the basin and the bottom of the basin. The pipe should stretch with the distance of the interval, and then connect the basin bottom and the floor drain firmly. If the bottom basin is not used, the water bar of the shower room should be pasted into the floor tile when tiling, the reason for this is to have a good water retaining property.
Step 2: Inspection and maintenance: after the shower room is installed, the manufacturer needs to carry out water test and inspection to ensure that the water reaches all directions. Locating and drilling: use pencil and level ruler to confirm the drilling position of wall aluminum material, and use impact drill to drill holes.
Step 3: install the aluminum material: knock in the expanding screw at the drilling hole, and lock the aluminum strip on the wall with the screw.
Step 4: fix the glass: clamp the glass tightly to the bottom basin hole, and then fix it with screws.
Step 5: device pipe jacking: find the corresponding direction of drilling above the fixed glass, fix the device base and connect the pipe jacking. Fix it on the top of the glass with a bend sleeve.
Installation process of general shower room - shower room installed by manufacturer
Step 6: device rack: select the orientation device sanitary ware.
Step 7: install the movable door: install the hardware of the movable door, and install the hinge at the reserved hole of the fixed door. After the shower room is installed, the manufacturer will adjust the orientation of the lotus leaf shaft core until the best closing touch is achieved.
Step 8: Waterproof: install suction strip or water retaining strip on the side or under the glass as required. Use silica gel to seal the joints between aluminum material and wall, glass and bottom basin.
Step 9: debugging and fastening: check whether each part is comfortable and smooth, and adjust in time if any problem is found. After adjustment, tighten the corresponding screws to make the whole shower room stronger.
Step 10: finishing work: clip the decoration aluminum strip into the wall mounted aluminum material to ensure its neat appearance. Finally, the entire shower room will be wiped clean with a rag.